Airbike Construction Notes

Back


 4/11/00

The wing kits arrived today. Both crates had some damage on one end from a forklift, but everything inside survived fine. We did an inspection and everything on the parts list is present. TEAM does a great packaging job and everything is well marked. We had already built a 16'x4' bench and had materials for the rib jigs. Started building rib jigs. 4/12/00 Finished up rib jig and started cutting wood for the first rib. Finished first rib. 4/13/00 Pulled the staples from the first rib and did some sanding. The rear spar pass through is not quite square so I will have to make some adjustment to the jig. Didn't use enough glue on a few gussets. Must use enough glue to press out of joint slightly when stapled. 4/15/00 Cleaned up rib jig and made adjustments. Made templates for all gussets. 4/15/00 - 4/21/00 Cut all rib gussets and 1/4" spruce. 4/22/00 - 6/10/00 Glued gussets to one side of rib first. After all ribs were dry, finished gussets on second side. After drying, all rib cap extensions were trimmed on the front of each rib. Gussets were sanded around outside of ribs and inside rear spar pass through. The 1/4" plywood reinforcements were added to the six ribs supporting the aileron hinges. Pulled the staples in all ribs. 9/3/00 Resuming work as flying season slows down. Made nose rib routing template out of 3/8" ply. 9/4/00 Re-made nose rib template out of 3/4" ply. The thinner ply was riding up between the router bit bearing and the top of the cutter. The thicker ply works well. Routed eight 1/4" nose ribs. 9/6/00 Rough cut eighteen 1/8" nose ribs on bandsaw. Built up the router jig to support the router base better around the outside. This prevents tipping the router and digging the bit into the bottom ribs. Five ribs at a time seem to work well. All nose ribs finished except for the slot for the leading edge stringer. 9/30/00 Made 1/4" nose rib template out of 3/4" ply. Rough cut 14 1/4" nose ribs. 10/1/00 Made 1/8" aileron nose rib template out of 3/4" ply. Built router support jig for nose rib templates. Drilled hold-down holes in the 14 1/4" aileron nose ribs. 12/9/00 Rough cut 20 1/8" aileron nose ribs using correct template. Used templates to router all aileron nose ribs. (20) @ 1/4" and (14) @ 1/8". Finish sanding/filing all remaining rib gussets. Made all 1/8" (4) root and tip rib solid ply end caps. 12/10/00 Glued solid ply end caps to two tip ribs. Pulled staples on first two tip rib end caps. Glued remaining end caps to root ribs. Trimmed ply end cap on first two tip ribs. 12/11/00 Cut and sized aileron hinge bearing supports for root and tip hinges. Cut and glued center aileron ply spacers for bearing brackets. 12/14/00 Pulled staples in remaining 2 rib end caps. 12/23/00 Finished fabricating 4130 aileron bearing support brackets (6). Trimmed trailing edge of all ribs to 46". Made first aileron end cap from 1/16' ply. Rough cut remaining 3 end caps for ailerons. 12/24/00 Finished fabricating remaining 3 aileron end caps. Drilled 1/4" hole in all aileron end caps for hinges. Glued aileron end caps to root and tip ribs. Glued 1/4" aileron nose ribs to root, tip and #5 ribs. Built jig for main spars (both in one jig). Sized and cut all RS-5 and RS-9 spar verticals for main spars. Cut 12" RS-7 spar cap extension for wing tips (4). Cut root RS-9 doublers and RS-8 diagonals. 12/25/00 Pulled all staples from root and tip aileron end caps and #5 ribs. Made RS-11 diagonals for main spars. Tapered RS-7 doublers for main spars. Made RS-7 doublers for spar cap splices on main spars. 12/26/00 Built and bolted down wedge clamps. Laid out wax paper, clamps and blocks for gluing. Glued both main spars. 12/30/00 Sized and cut shear webs for main spars. Glued and stapled shear webs to both main spars. 1/1/01 Pulled staples from main spar shear webs. Light block sanding of main spars. 1/7/01 Cut all verticals and diagonals for rear spars. Cut RS-7 doublers for both rear spars. Reset jig for rear spars and fit all spar pieces. Trimmed remaining 2 rib end caps and all aileron end caps. Rough cut root and strut attach brackets and aileron horns from RS-100. 1/13/01 Moved wedge clamps for rear spar jig. Glued up both rear spars. 1/14/01 Removed rear spars form jigs. Block sanded rear spars. Cut and fit RS-53602 ply shear webbing for both rear spars. Glued RS-53602 ply shear webs to one rear spar. 1/20/01 Glued RS-53602 ply shear web to remaining rear spar. 1/21/01 Removed rear spars form jigs. Disassembled wing spar jigs. Pilot drilled root fittings, strut fittings and aileron horns. Finish drilled root fittings, strut fittings and aileron horns. Shaped ends on all fittings and aileron horns. Deburred and finished root fittings, strut fittings and aileron horns. Glued RS-9 aileron hinge support to all 4 end and root ribs. 1/22/01 Made bushings for all aileron hinges. Drilled and assembled aileron brackets for end, root and #5 ribs. 1/25/01 Sanded bottom edges of ply webbing flush on all spars. 1/26/01 Block sanded rear spar ends. Polished all aluminum brackets. Built fixtures for cutting bevels on top of spars. Setup and cut bevels for front spars. Pulled webbing staples from rear spars. Setup and cut bevels for rear spars. Trial fit ribs on spars of left wing. 2/3/01 Cut and fit all RS-561 doublers for attach fittings. Glued all RS-561 doublers for strut attach fittings. 2/10/01 Drilled all spars for root and strut (1/4" bolts) attach fittings. Attached 21/2"x3/4" reference board to table to locate front spars. Clamped front spar (left wing) to reference board and bench. Slid all ribs on rear spar to begin left wing assembly. 2/11/01 Cut doublers for root and #1 ribs for wing attach brackets. Glued doublers on root and #1 ribs. Glued RS-561 ply doublers on root of both left spars. 2/15/01 Cut and fit reliefs for RS-561 ply and root attach brackets, in root and #1 ribs for left wing. Reamed root attach fitting bolt holes in both spars (clean-up from gluing doublers). 2/16/01 Set brass nails in all ribs - left wing. Glued all ribs to both spars. Drove brass nails flush. 2/17/01 Cut and fit RS-9, RS-8 and RS-7 anti-drag diagonals for left wing. Cut RS-561 gussets for anti-drag diagonals. Cut and fit RS-11 gussets for anti-drag diagonals. Glued all parts for anti-drag diagonals for left wing. Cut and beveled (36) trailing edge gussets. Cut slots in root ribs for fuel level viewing. Glued (9) trailing edge gussets to bottom of ribs, left wing. 2/18/01 Cut and fit RS-15 trailing edge for left wing. Marked rib positions and glued RS-15 trailing edge to left wing. Cut and fit RS-653 aileron spars for left wing. Positioned and glued aileron spars to ribs on left wing. 2/19/01 Trimmed and sanded RS-15 trailing edge on left wing. Fit root and tip ribs. Trimmed and sanded aileron spar. Cut and fit RS-3 aileron spar caps. Glued aileron spar caps. Varnished tip and root ribs and rear spar shear web (left wing). 2/21/01 Glued root and tip ribs to left wing. Cut and fit RS-1 aileron diagonals (top). Glued top aileron diagonals. Glued midpoint of anti-drag diagonals to ribs (left wing). 2/22/01 Cut and fit RS-7 and RS-8 fuel tank supports on left wing. Glued RS-7 and RS-8 tank supports. Cut, fit and glued bottom RS-3 aileron spar cap pieces (left wing). 2/23/01 Cut, fit and glued RS-1 bottom aileron diagonals. Marked position for aileron nose ribs. Glued aileron nose ribs. Glued top trailing edge gussets. Sanded aileron RS-3 spar caps flush with ribs (left wing). 2/24/01 Glued RS-5 lower compression members on left wing. Glued 1/4" aileron nose rib doublers at #4, #7 and #10 ribs. Cut aileron free of left wing. Shaped aileron rib caps to match nose rib curve. Sanded all trailing edge gussets smooth. Block sanded aileron spar caps, rib caps, end caps to match nose ribs. Trial fit aileron hinge brackets and hardware. 3/1/01 Varnished left aileron. 3/2/01 Varnished left wing. 3/3/01 Glued upper RS-5 compression members to left wing. 3/6/01 Removed left wing and aileron from bench. Fit all ribs except root and tip to right wing. 3/7/01 Cut, fit and glued 1/4"sq doublers on root and tip ribs for attach bracket clearance (right wing). Glued RS-561 root attach doublers on both right spars. 3/8/01 Cut reliefs for root fittings in rib #1 for right wing. Pre-set brass nails for ribs. Glued all ribs to both right spars. 3/9/01 Cut RS-11 gussets for right wing anti-drag diagonals. Cut and fit RS-9, RS-8, RS-7 and RS-561 parts for anti-drag diagonals. Glued all pieces for anti-drag diagonals for right wing. Glued bottom trailing edge gussets for right wing. 3/10/01 Cut fit and glued RS-15 trailing edge to right wing. Repaired #2 rib break aft of rear spar. 3/11/01 Cut, fit and glued aileron spar to right wing. 3/13/01 Cut, fit and glued RS-3 aileron spar cap pieces to right wing. 3/16/01 Cut, fit and glued RS-1 top aileron diagonals to right wing. 3/17/01 Cut fit and glued RS-3 bottom aileron spar caps to right wing. Cut fit and glued bottom anti-drag diagonal gusset. Glued anti-drag diagonals to midpoint ribs. Finished bottom repair of #2 rib. 3/18/01 Cut, fit and glued RS-1 bottom aileron diagonals for right wing. Cut, fit and glued top RS-5 compression members to right wing. 3/20/01 Airframe, completion and engine mount kits arrive. Full inventory and trial fit of fuselage halves and landing gear struts. 3/23/01 Glued root and tip ribs to right wing. 3/24/01 Beveled top aileron spars for right wing. Cut, bent and shaped 1/4" steel wing-retaining pins. Trial fit left wing to fuselage. Glued bottom RS-5 compression members to right wing. 3/26/01 Cut, fit and glued RS-7 and RS-8 tank supports for right wing. 3/27/01 Glued aileron nose ribs to right wing. Glued remaining trailing edge gussets to right wing. 3/28/01 Uncrated new Hirth 2702. Full inventory of parts. 3/30/01 Fit right wing to fuselage. 3/31/01 Cut, fit and glued upper RS-5 fuel tank compartment reinforcements to right wing. Cut right aileron free of wing. Shaped aileron rib caps to aileron leading edge. Sanded trailing edge gussets. Wired brushed and filed welds on front fuselage half. Cleaned front fuselage half with AFS high strength cleaner (10:1 mix with water). Applied AFS steel conversion coating to front half of fuselage (foam brush - bad idea). 4/1/01 Cleaned up glue joints on upper tank supports for right wing. Sanded front fuselage half to get rid of bubbles formed by foam brush. Re-applied conversion coating by wiping on with a clean rag (worked like a charm). Wire brushed and prepped rear fuselage half. Ground excess plate flush around tailwheel mount. Cleaned rear fuse half with AFS cleaner. Applied AFS conversion coating to rear fuse half (wiped on). 4/4/01 Cut (18) RS-1 verticals for 1/8" nose ribs. Glued RS-1 verticals to 1/8" nose ribs. 4/8/01 Cut and fit (2) RS-5891 play tank floors. Cut and fit RS-4 members for tank floors. Cut and fit RS-5 tank cover support for rib #1 on right wing. Cut and fit RS-5 tank cover support for rear spar on right wing. Made (2) RS-672 1/4" ply aileron nose ribs for rib 5a on both wings. Cut off 1/4" of (4) 1/4" ply nose ribs for doublers on ribs #5 and #9. Cut and fit RS-1 sticks for (2) root nose rib and (2) tip nose rib doublers. Glued #1 rib and rear spar RS-5 tank cover supports on right wing. Glued RS-4 members to both tank floors. Glued 1/4" ply doublers on #4, #7 and #10 aileron nose ribs. Glued 1/4" ply doublers to 1/8" ply nose ribs at #5 and #9 on both wings. Glued RS-1 sticks to root and tip nose rib doublers. 4/9/01 Sanded upper tank support members flush on right wing. Filed and sanded all nose ribs to clean up glue squeeze out. Cut slots in all nose ribs for RS-4 stringer. 4/10/01 Glued 1/4" RS-1 reinforcement to #5a aileron nose ribs. Splice both RS-4 leading edge stringers. Glued RS-1 diagonals in both root and tip aileron bays. 4/13/01 Cut relief in root nose rib for root attach bracket. Glued all nose ribs to right wing. Glued RS-4 LE stringer to right wing nose ribs. 4/19/01 Primed all aluminum wing brackets. Primed rear half of fuselage. 4/21/01 Sanded one wheel pant. Varnished right wing LE stringer, nose ribs and spar. Varnished right aileron LE ribs and spar. 4/22/01 Profiled al ribs and nose ribs on right wing for LE ply sheet. Built form for LE ply sheet. Built (2) wheel pants brackets. Drilled brake back plates for axle plate bolts. Made (2) 1 7/16" axle spacers. Made (2) arm brackets for LG brake cable adjusters. 4/23/01 Cut RS-516 LE ply for right wing center panel. Put RS-516 LE ply into form. Positioned landing gear legs on fuse and drilled 3/16" holes for retaining bolts. Bolted on gear. Cleaned up vertical stabilizer. Trial fit vert stab and rudder to airframe. 4/25/01 Varnished front or right LE spar. Varnished inside of right wing center LE ply. Made and pressed control stick pivot bushing into place. Slotted center LE ply for strut attach brackets. Glued center LE ply to right wing. Drilled 1/16" holes in wing retaining pins for safety pins. 4/26/01 Pulled staples and clamps from center LE ply. Sanded off excess glue and fit LE ply slots for strut attach fittings. Cut and fit root LE ply for right wing. Placed root LE ply in form. Cut our LE root and tip rib inspection/access holes. 4/27/01 Masked and varnished root LE ply for right wing. Bolted root and strut attach brackets to right wing (permanent). Cut and formed tip LE ply for right wing. Primed all wing attach fittings and some of fuse. Glued root LE ply to right wing. 4/28/01 Removed staples from root LE ply on right wing. Sanded joints and cleaned up glue. Masked and varnished tip LE ply for right wing. Glued tip LE ply to right wing. 4/29/01 Removed staples from tip LE ply on right wing. Sanded joints and cleaned up glue.

Back

mailto:airbiker@northcoastsound.com